
REFERENCES

Debrecen (HU) - CATL

The scheduling of the delivery of an 84-unit heat pump mechanical system is currently in progress, along with the preparation of the related installation works.
Hajdúböszörmény (HU) - Residential complex

Supply of a 720 kW total capacity Cooper & Hunter heat pump system, along with the installation of a 600 kW VRV system comprising 302 indoor units and the construction of approximately 13 km of piping network.
Budapest (HU) - Ezred Street Residential Building

Complete installation of the VRV system's refrigerant piping network, from material procurement through to full execution of all installation works.
Budapest (HU) - Puro Hotel

Construction of a 9,000-meter VRV piping network
Operational barracks (HU)

The construction of the piping network is currently in progress
Diószeghy Sámuel Dormitory (HU)

450 kW Cooper & Hunter VRF and air conditioning system – product supply and full installation.
Debrecen (HU) - Xanga Industrial Hall

Partial installation of a Daikin VRV system.
Mogyoród (HU) - Hungaroring

Supply of a 250 kW total capacity Samsung VRF system.
Budapest (HU) - Triad Residence Residential Building

Installation of split cooling systems for the office block of the industrial hall building.
Paks II. (HU) - Office block

Installation of the VRV piping network.
Budapest (HU) - Millenuim Gardens

Installation of a 120 kW total capacity VRV system.
Debrecen (HU) - Galamb Street

Installation of the VRV system piping network.
MIP Office Building (HU)

The full delivery and installation of the VRV system is currently in progress.
NVSZC Borbély Lajos Technical School (HU)

Sale of over 300 residential heat pumps in 2024-2025. (HU)

• Maintenance of air conditioning and ventilation systems in Budapest (HU) hospitals
• Debrecen (HU) – Ghibli Industrial Hall
